Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Luis Peña

MIL · AA · SS

Prospect Baseline Rank #14

Player Assessment

Current model read

Luis Peña combines a high-end projection with a wider-than-settled outcome range. Run (70) is the clearest carrying tool in the current scouting mix. The age-to-level relationship adds development value to the current performance.

Prospect Score & Development

71/100

Above average composite evaluation

Baseline

80/100

Central modeled outcome; separate from Prospect Score.

Confidence

94/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
60/100

Solid current production

OPS
Offensive impact.795 OPSBalanced offensive output
K%
Contact19.9% KNear expected range
OBP
On-base foundation.380 OBPStrong on-base foundation

Scouting Profile

20–80 scouting scale
Overall
55
Hit
55
Power
55
Run
70
Field
45
Arm
55

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The projection centers on 80, bounded by a 54 Floor and 83 Ceiling. The very wide spread keeps both the upside and downside cases relevant to the current evaluation. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The next level of competition is the most informative test. At AA, age-to-level context is already helping the projection. Maintaining the same indicators against stronger competition would strengthen the Baseline more than simply repeating the current line in place.

Model factors and risk context
Model Risk Index0
Age to level75
Track record64
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 54Baseline 80Ceiling 83

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 80 on · Current Floor 54, Baseline 80, Ceiling 83

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1280pbm_affbdd7c43a60c55
2026-10-0980pbm_affbdd7c43a60c55
2026-10-0880pbm_affbdd7c43a60c55
2026-10-0778pbm_affbdd7c43a60c55
2026-10-0578pbm_affbdd7c43a60c55
2026-10-0478pbm_affbdd7c43a60c55
2026-10-0378pbm_affbdd7c43a60c55
2026-09-3078pbm_affbdd7c43a60c55
2026-09-2978pbm_affbdd7c43a60c55
2026-09-2578pbm_affbdd7c43a60c55
2026-09-2477pbm_affbdd7c43a60c55
2026-09-2277pbm_affbdd7c43a60c55
2026-09-2177pbm_affbdd7c43a60c55
2026-09-1977pbm_affbdd7c43a60c55
2026-09-1877pbm_affbdd7c43a60c55
2026-09-1777pbm_affbdd7c43a60c55
2026-09-1677pbm_affbdd7c43a60c55
2026-09-1577pbm_affbdd7c43a60c55
2026-09-1477pbm_affbdd7c43a60c55
2026-09-0977pbm_affbdd7c43a60c55
2026-09-0686pbm_6169a2220134229c
2026-09-0586pbm_6169a2220134229c
2026-09-0386pbm_6169a2220134229c
2026-09-0286pbm_6169a2220134229c
2026-09-0186pbm_6169a2220134229c
2026-08-2886pbm_6169a2220134229c
2026-08-2786pbm_6169a2220134229c
2026-08-2586pbm_145fdb152195dbe4
2026-08-2386pbm_6169a2220134229c
2026-08-2286pbm_6169a2220134229c
2026-08-2086pbm_6169a2220134229c
2026-08-1979pbm_6169a2220134229c
2026-08-1879pbm_6169a2220134229c
2026-08-1779pbm_6169a2220134229c
2026-08-1679pbm_6169a2220134229c
2026-08-1479pbm_6169a2220134229c
2026-08-1380pbm_6169a2220134229c
2026-08-1180pbm_6169a2220134229c
2026-08-1080pbm_6169a2220134229c
2026-08-0980pbm_6169a2220134229c
2026-08-0880pbm_6169a2220134229c
2026-08-0780pbm_6169a2220134229c
2026-08-0580pbm_6169a2220134229c
2026-08-0380pbm_6169a2220134229c
2026-08-0180pbm_6169a2220134229c
2026-07-3180pbm_6169a2220134229c
2026-07-3080pbm_6169a2220134229c
2026-07-2980pbm_6169a2220134229c
2026-07-2880pbm_6169a2220134229c
2026-07-2780pbm_6169a2220134229c
2026-07-2680pbm_6169a2220134229c
2026-07-2580pbm_6169a2220134229c
2026-07-2480pbm_6169a2220134229c
2026-07-2380pbm_6169a2220134229c
2026-07-2280pbm_6169a2220134229c
2026-07-2180pbm_6169a2220134229c
2026-07-1680pbm_6169a2220134229c
2026-07-1480pbm_6169a2220134229c
2026-07-1280pbm_6169a2220134229c
2026-07-1180pbm_6169a2220134229c
2026-07-0980pbm_6169a2220134229c
2026-07-0780pbm_6169a2220134229c
2026-07-0580pbm_6169a2220134229c
2026-07-0380pbm_6169a2220134229c
2026-07-0183pbm_6169a2220134229c
2026-06-3083pbm_6169a2220134229c
2026-06-2983pbm_6169a2220134229c
2026-06-2883pbm_6169a2220134229c
2026-06-2683pbm_6169a2220134229c
2026-06-2583pbm_6169a2220134229c
2026-06-2483pbm_6169a2220134229c
2026-06-2383pbm_6169a2220134229c
2026-06-2283pbm_6169a2220134229c
2026-06-2183pbm_6169a2220134229c
2026-06-2083pbm_6169a2220134229c
2026-06-1983pbm_6169a2220134229c
2026-06-1883pbm_6169a2220134229c
2026-06-1783pbm_6169a2220134229c
2026-06-1683pbm_145fdb152195dbe4
2026-06-1583pbm_145fdb152195dbe4
2026-06-1483pbm_145fdb152195dbe4
2026-06-1383pbm_145fdb152195dbe4
2026-06-1283pbm_145fdb152195dbe4
2026-06-1183pbm_145fdb152195dbe4
2026-06-1083pbm_145fdb152195dbe4
2026-06-0983pbm_145fdb152195dbe4
2026-06-0883pbm_145fdb152195dbe4
2026-06-0783pbm_145fdb152195dbe4
2026-06-0683pbm_145fdb152195dbe4
2026-06-0583pbm_145fdb152195dbe4
2026-06-0483pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 83 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 94/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.