Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Jacob Kmatz

LAD · AA · P

Prospect Baseline Rank #156

Player Assessment

Current model read

Jacob Kmatz's current production is forcing the profile above its original scouting foundation. The 71 Performance Grade sits 31 points above the 40 scouting foundation, a large enough gap to change the shape of the evaluation. Slider (70) is the clearest carrying tool in the current scouting mix.

Prospect Score & Development

59/100

Developing composite evaluation

Baseline

73/100

Central modeled outcome; separate from Prospect Score.

Confidence

91/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
71/100

Solid current production

K/9
Miss ability12.4 K/9Strong strikeout signal
K-BB%
Dominance30.5% K-BBStrong strikeout-to-walk foundation
WHIP
Traffic prevention0.96 WHIPStrong traffic prevention

Scouting Profile

20–80 scouting scale
Overall
40
Fastball
60
Slider
70
Curveball
60
Control
55

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The projection centers on 73, bounded by a 65 Floor and 76 Ceiling. There is still meaningful movement available in either direction, but the range is not unusually volatile. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The key question is whether the production forces the scouting view upward rather than drifting back toward it. Repeating the same performance against stronger competition or over a larger sample would strengthen the Floor and make the breakout harder to dismiss. That confirmation matters more now than simply adding another short stretch of strong surface numbers.

Model factors and risk context
Model Risk Index0
Age to level46
Track record77
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 65Baseline 73Ceiling 76

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 73 on · Current Floor 65, Baseline 73, Ceiling 76

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1273pbm_affbdd7c43a60c55
2026-10-0973pbm_affbdd7c43a60c55
2026-10-0873pbm_affbdd7c43a60c55
2026-10-0771pbm_affbdd7c43a60c55
2026-10-0571pbm_affbdd7c43a60c55
2026-10-0471pbm_affbdd7c43a60c55
2026-10-0371pbm_affbdd7c43a60c55
2026-09-3071pbm_affbdd7c43a60c55
2026-09-2971pbm_affbdd7c43a60c55
2026-09-2571pbm_affbdd7c43a60c55
2026-09-2471pbm_affbdd7c43a60c55
2026-09-2271pbm_affbdd7c43a60c55
2026-09-2171pbm_affbdd7c43a60c55
2026-09-1971pbm_affbdd7c43a60c55
2026-09-1871pbm_affbdd7c43a60c55
2026-09-1771pbm_affbdd7c43a60c55
2026-09-1671pbm_affbdd7c43a60c55
2026-09-1571pbm_affbdd7c43a60c55
2026-09-1471pbm_affbdd7c43a60c55
2026-09-0972pbm_affbdd7c43a60c55
2026-09-0670pbm_6169a2220134229c
2026-09-0570pbm_6169a2220134229c
2026-09-0370pbm_6169a2220134229c
2026-09-0270pbm_6169a2220134229c
2026-09-0170pbm_6169a2220134229c
2026-08-2870pbm_6169a2220134229c
2026-08-2769pbm_6169a2220134229c
2026-08-2567pbm_145fdb152195dbe4
2026-08-2367pbm_6169a2220134229c
2026-08-2268pbm_6169a2220134229c
2026-08-2068pbm_6169a2220134229c
2026-08-1968pbm_6169a2220134229c
2026-08-1867pbm_6169a2220134229c
2026-08-1767pbm_6169a2220134229c
2026-08-1667pbm_6169a2220134229c
2026-08-1466pbm_6169a2220134229c
2026-08-1366pbm_6169a2220134229c
2026-08-1164pbm_6169a2220134229c
2026-08-1064pbm_6169a2220134229c
2026-08-0964pbm_6169a2220134229c
2026-08-0864pbm_6169a2220134229c
2026-08-0764pbm_6169a2220134229c
2026-08-0563pbm_6169a2220134229c
2026-08-0364pbm_6169a2220134229c
2026-08-0164pbm_6169a2220134229c
2026-07-3164pbm_6169a2220134229c
2026-07-3064pbm_6169a2220134229c
2026-07-2964pbm_6169a2220134229c
2026-07-2864pbm_6169a2220134229c
2026-07-2764pbm_6169a2220134229c
2026-07-2664pbm_6169a2220134229c
2026-07-2563pbm_6169a2220134229c
2026-07-2462pbm_6169a2220134229c
2026-07-2363pbm_6169a2220134229c
2026-07-2263pbm_6169a2220134229c
2026-07-2163pbm_6169a2220134229c
2026-07-1661pbm_6169a2220134229c
2026-07-1460pbm_6169a2220134229c
2026-07-1260pbm_6169a2220134229c
2026-07-1161pbm_6169a2220134229c
2026-07-0961pbm_6169a2220134229c
2026-07-0761pbm_6169a2220134229c
2026-07-0561pbm_6169a2220134229c
2026-07-0358pbm_6169a2220134229c
2026-07-0158pbm_6169a2220134229c
2026-06-3058pbm_6169a2220134229c
2026-06-2958pbm_6169a2220134229c
2026-06-2858pbm_6169a2220134229c
2026-06-2658pbm_6169a2220134229c
2026-06-2558pbm_6169a2220134229c
2026-06-2458pbm_6169a2220134229c
2026-06-2357pbm_6169a2220134229c
2026-06-2257pbm_6169a2220134229c
2026-06-2157pbm_6169a2220134229c
2026-06-2057pbm_6169a2220134229c
2026-06-1957pbm_6169a2220134229c
2026-06-1856pbm_6169a2220134229c
2026-06-1756pbm_6169a2220134229c
2026-06-1656pbm_145fdb152195dbe4
2026-06-1556pbm_145fdb152195dbe4
2026-06-1452pbm_145fdb152195dbe4
2026-06-1352pbm_145fdb152195dbe4
2026-06-1252pbm_145fdb152195dbe4
2026-06-1151pbm_145fdb152195dbe4
2026-06-1040pbm_145fdb152195dbe4
2026-06-0962pbm_145fdb152195dbe4
2026-06-0862pbm_145fdb152195dbe4
2026-06-0762pbm_145fdb152195dbe4
2026-06-0661pbm_145fdb152195dbe4
2026-06-0561pbm_145fdb152195dbe4
2026-06-0461pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 76 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 91/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.