Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Liam Doyle

STL · AA · P

Prospect Baseline Rank #53

Player Assessment

Current model read

Liam Doyle's profile is not evenly distributed; one tool is doing most of the separating. Fastball (70) is the clearest carrying tool in the current scouting mix.

Prospect Score & Development

64/100

Solid composite evaluation

Baseline

73/100

Central modeled outcome; separate from Prospect Score.

Confidence

92/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
59/100

Solid current production

K/9
Miss ability11.4 K/9Strong strikeout signal
BB/9
Command4.7 BB/9Command risk
HR/9
Contact management0.9 HR/9Near expected range

Scouting Profile

20–80 scouting scale
Overall
55
Fastball
70
Slider
50
Control
50

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The current Baseline is 73; the model's plausible outcome window runs from 58 on the low end to 76 on the high end. The width matters: the upside is real, but the profile still has enough unresolved information to produce materially different outcomes. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

Watch whether the fastball continues to separate as the competition gets better. The profile does not need every tool to jump; it needs the carrying skill to remain impactful enough to support the overall role. If that tool holds while the secondary skills improve even modestly, the Baseline has room to strengthen.

Model factors and risk context
Model Risk Index10
Age to level60
Track record63
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 58Baseline 73Ceiling 76

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 73 on · Current Floor 58, Baseline 73, Ceiling 76

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1273pbm_affbdd7c43a60c55
2026-10-0973pbm_affbdd7c43a60c55
2026-10-0873pbm_affbdd7c43a60c55
2026-10-0772pbm_affbdd7c43a60c55
2026-10-0572pbm_affbdd7c43a60c55
2026-10-0472pbm_affbdd7c43a60c55
2026-10-0372pbm_affbdd7c43a60c55
2026-09-3072pbm_affbdd7c43a60c55
2026-09-2972pbm_affbdd7c43a60c55
2026-09-2572pbm_affbdd7c43a60c55
2026-09-2472pbm_affbdd7c43a60c55
2026-09-2272pbm_affbdd7c43a60c55
2026-09-2172pbm_affbdd7c43a60c55
2026-09-1972pbm_affbdd7c43a60c55
2026-09-1872pbm_affbdd7c43a60c55
2026-09-1772pbm_affbdd7c43a60c55
2026-09-1672pbm_affbdd7c43a60c55
2026-09-1572pbm_affbdd7c43a60c55
2026-09-1472pbm_affbdd7c43a60c55
2026-09-0972pbm_affbdd7c43a60c55
2026-09-0672pbm_6169a2220134229c
2026-09-0572pbm_6169a2220134229c
2026-09-0372pbm_6169a2220134229c
2026-09-0272pbm_6169a2220134229c
2026-09-0172pbm_6169a2220134229c
2026-08-2872pbm_6169a2220134229c
2026-08-2772pbm_6169a2220134229c
2026-08-2572pbm_145fdb152195dbe4
2026-08-2372pbm_6169a2220134229c
2026-08-2272pbm_6169a2220134229c
2026-08-2072pbm_6169a2220134229c
2026-08-1972pbm_6169a2220134229c
2026-08-1872pbm_6169a2220134229c
2026-08-1772pbm_6169a2220134229c
2026-08-1672pbm_6169a2220134229c
2026-08-1475pbm_6169a2220134229c
2026-08-1375pbm_6169a2220134229c
2026-08-1175pbm_6169a2220134229c
2026-08-1075pbm_6169a2220134229c
2026-08-0975pbm_6169a2220134229c
2026-08-0875pbm_6169a2220134229c
2026-08-0775pbm_6169a2220134229c
2026-08-0575pbm_6169a2220134229c
2026-08-0375pbm_6169a2220134229c
2026-08-0175pbm_6169a2220134229c
2026-07-3175pbm_6169a2220134229c
2026-07-3075pbm_6169a2220134229c
2026-07-2975pbm_6169a2220134229c
2026-07-2876pbm_6169a2220134229c
2026-07-2776pbm_6169a2220134229c
2026-07-2676pbm_6169a2220134229c
2026-07-2576pbm_6169a2220134229c
2026-07-2476pbm_6169a2220134229c
2026-07-2376pbm_6169a2220134229c
2026-07-2276pbm_6169a2220134229c
2026-07-2176pbm_6169a2220134229c
2026-07-1676pbm_6169a2220134229c
2026-07-1476pbm_6169a2220134229c
2026-07-1276pbm_6169a2220134229c
2026-07-1176pbm_6169a2220134229c
2026-07-0976pbm_6169a2220134229c
2026-07-0776pbm_6169a2220134229c
2026-07-0576pbm_6169a2220134229c
2026-07-0377pbm_6169a2220134229c
2026-07-0180pbm_6169a2220134229c
2026-06-3080pbm_6169a2220134229c
2026-06-2980pbm_6169a2220134229c
2026-06-2880pbm_6169a2220134229c
2026-06-2680pbm_6169a2220134229c
2026-06-2580pbm_6169a2220134229c
2026-06-2480pbm_6169a2220134229c
2026-06-2380pbm_6169a2220134229c
2026-06-2280pbm_6169a2220134229c
2026-06-2180pbm_6169a2220134229c
2026-06-2080pbm_6169a2220134229c
2026-06-1980pbm_6169a2220134229c
2026-06-1880pbm_6169a2220134229c
2026-06-1780pbm_6169a2220134229c
2026-06-1680pbm_145fdb152195dbe4
2026-06-1580pbm_145fdb152195dbe4
2026-06-1480pbm_145fdb152195dbe4
2026-06-1380pbm_145fdb152195dbe4
2026-06-1280pbm_145fdb152195dbe4
2026-06-1180pbm_145fdb152195dbe4
2026-06-1080pbm_145fdb152195dbe4
2026-06-0980pbm_145fdb152195dbe4
2026-06-0880pbm_145fdb152195dbe4
2026-06-0780pbm_145fdb152195dbe4
2026-06-0680pbm_145fdb152195dbe4
2026-06-0580pbm_145fdb152195dbe4
2026-06-0480pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 76 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 10/100. This is a model measure, not a statement of real-world risk. Model confidence is 92/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.