Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Jefferson Rojas

NYM · AAA · SS

Prospect Baseline Rank #44

Player Assessment

Current model read

The clearest reason to pay attention to Jefferson Rojas is the separation between what was expected and what he is currently producing. The 66 Performance Grade sits 11 points above the 55 scouting foundation, a large enough gap to change the shape of the evaluation. The age-to-level relationship adds development value to the current performance.

Prospect Score & Development

65/100

Solid composite evaluation

Baseline

80/100

Central modeled outcome; separate from Prospect Score.

Confidence

96/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
66/100

Solid current production

ISO
Power.231 ISOAbove-average game power
K%
Contact17.3% KStrong contact signal
OBP
On-base foundation.338 OBPNear expected range

Scouting Profile

20–80 scouting scale
Overall
55
Hit
55
Power
50
Run
50
Field
50
Arm
55

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

Prospect Baseline places the central outcome at 80, with a modeled range from 60 to 83. The width matters: the upside is real, but the profile still has enough unresolved information to produce materially different outcomes. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The development advantage is already being rewarded, so the next question is how well the skills travel upward. At AAA, age-to-level context is already helping the projection. Maintaining the same indicators against stronger competition would strengthen the Baseline more than simply repeating the current line in place.

Model factors and risk context
Model Risk Index0
Age to level78
Track record69
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 60Baseline 80Ceiling 83

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 80 on · Current Floor 60, Baseline 80, Ceiling 83

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1280pbm_affbdd7c43a60c55
2026-10-0980pbm_affbdd7c43a60c55
2026-10-0880pbm_affbdd7c43a60c55
2026-10-0779pbm_affbdd7c43a60c55
2026-10-0577pbm_affbdd7c43a60c55
2026-10-0477pbm_affbdd7c43a60c55
2026-10-0377pbm_affbdd7c43a60c55
2026-09-3077pbm_affbdd7c43a60c55
2026-09-2977pbm_affbdd7c43a60c55
2026-09-2577pbm_affbdd7c43a60c55
2026-09-2477pbm_affbdd7c43a60c55
2026-09-2277pbm_affbdd7c43a60c55
2026-09-2177pbm_affbdd7c43a60c55
2026-09-1978pbm_affbdd7c43a60c55
2026-09-1879pbm_affbdd7c43a60c55
2026-09-1778pbm_affbdd7c43a60c55
2026-09-1677pbm_affbdd7c43a60c55
2026-09-1577pbm_affbdd7c43a60c55
2026-09-1470pbm_affbdd7c43a60c55
2026-09-0970pbm_affbdd7c43a60c55
2026-09-0670pbm_6169a2220134229c
2026-09-0570pbm_6169a2220134229c
2026-09-0370pbm_6169a2220134229c
2026-09-0270pbm_6169a2220134229c
2026-09-0170pbm_6169a2220134229c
2026-08-2870pbm_6169a2220134229c
2026-08-2770pbm_6169a2220134229c
2026-08-2570pbm_145fdb152195dbe4
2026-08-2370pbm_6169a2220134229c
2026-08-2270pbm_6169a2220134229c
2026-08-2070pbm_6169a2220134229c
2026-08-1970pbm_6169a2220134229c
2026-08-1870pbm_6169a2220134229c
2026-08-1770pbm_6169a2220134229c
2026-08-1670pbm_6169a2220134229c
2026-08-1470pbm_6169a2220134229c
2026-08-1370pbm_6169a2220134229c
2026-08-1170pbm_6169a2220134229c
2026-08-1070pbm_6169a2220134229c
2026-08-0970pbm_6169a2220134229c
2026-08-0870pbm_6169a2220134229c
2026-08-0770pbm_6169a2220134229c
2026-08-0570pbm_6169a2220134229c
2026-08-0370pbm_6169a2220134229c
2026-08-0170pbm_6169a2220134229c
2026-07-3170pbm_6169a2220134229c
2026-07-3070pbm_6169a2220134229c
2026-07-2970pbm_6169a2220134229c
2026-07-2870pbm_6169a2220134229c
2026-07-2770pbm_6169a2220134229c
2026-07-2670pbm_6169a2220134229c
2026-07-2570pbm_6169a2220134229c
2026-07-2470pbm_6169a2220134229c
2026-07-2370pbm_6169a2220134229c
2026-07-2270pbm_6169a2220134229c
2026-07-2170pbm_6169a2220134229c
2026-07-1670pbm_6169a2220134229c
2026-07-1470pbm_6169a2220134229c
2026-07-1270pbm_6169a2220134229c
2026-07-1170pbm_6169a2220134229c
2026-07-0970pbm_6169a2220134229c
2026-07-0770pbm_6169a2220134229c
2026-07-0570pbm_6169a2220134229c
2026-07-0370pbm_6169a2220134229c
2026-07-0170pbm_6169a2220134229c
2026-06-3070pbm_6169a2220134229c
2026-06-2970pbm_6169a2220134229c
2026-06-2871pbm_6169a2220134229c
2026-06-2671pbm_6169a2220134229c
2026-06-2573pbm_6169a2220134229c
2026-06-2470pbm_6169a2220134229c
2026-06-2371pbm_6169a2220134229c
2026-06-2271pbm_6169a2220134229c
2026-06-2171pbm_6169a2220134229c
2026-06-2070pbm_6169a2220134229c
2026-06-1972pbm_6169a2220134229c
2026-06-1871pbm_6169a2220134229c
2026-06-1771pbm_6169a2220134229c
2026-06-1671pbm_145fdb152195dbe4
2026-06-1571pbm_145fdb152195dbe4
2026-06-1471pbm_145fdb152195dbe4
2026-06-1370pbm_145fdb152195dbe4
2026-06-1270pbm_145fdb152195dbe4
2026-06-1170pbm_145fdb152195dbe4
2026-06-1070pbm_145fdb152195dbe4
2026-06-0971pbm_145fdb152195dbe4
2026-06-0871pbm_145fdb152195dbe4
2026-06-0770pbm_145fdb152195dbe4
2026-06-0670pbm_145fdb152195dbe4
2026-06-0570pbm_145fdb152195dbe4
2026-06-0470pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 83 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 96/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.