Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Jirvin Morillo

CIN · Single-A · C

Prospect Baseline Rank #121

Player Assessment

Current model read

Performance is doing more work than the scouting grade in Jirvin Morillo's current evaluation. The 69 Performance Grade sits 24 points above the 45 scouting foundation, a large enough gap to change the shape of the evaluation.

Prospect Score & Development

59/100

Developing composite evaluation

Baseline

71/100

Central modeled outcome; separate from Prospect Score.

Confidence

88/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
69/100

Solid current production

OPS
Offensive impact1.013 OPSStrong overall offensive impact
K%
Contact25.2% KNear expected range
BB%
Approach18.5% BBStrong on-base approach

Scouting Profile

20–80 scouting scale
Overall
45
Hit
50
Power
50
Run
40
Field
40
Arm
50

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The projection centers on 71, bounded by a 69 Floor and 74 Ceiling. The narrow spread suggests the profile is becoming more settled rather than being driven by one volatile signal. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The key question is whether the production forces the scouting view upward rather than drifting back toward it. Repeating the same performance against stronger competition or over a larger sample would strengthen the Floor and make the breakout harder to dismiss. That confirmation matters more now than simply adding another short stretch of strong surface numbers.

Model factors and risk context
Model Risk Index3
Age to level59
Track record71
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 69Baseline 71Ceiling 74

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 71 on · Current Floor 69, Baseline 71, Ceiling 74

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1271pbm_affbdd7c43a60c55
2026-10-0971pbm_affbdd7c43a60c55
2026-10-0871pbm_affbdd7c43a60c55
2026-10-0772pbm_affbdd7c43a60c55
2026-10-0572pbm_affbdd7c43a60c55
2026-10-0472pbm_affbdd7c43a60c55
2026-10-0371pbm_affbdd7c43a60c55
2026-09-3071pbm_affbdd7c43a60c55
2026-09-2971pbm_affbdd7c43a60c55
2026-09-2571pbm_affbdd7c43a60c55
2026-09-2471pbm_affbdd7c43a60c55
2026-09-2271pbm_affbdd7c43a60c55
2026-09-2171pbm_affbdd7c43a60c55
2026-09-1971pbm_affbdd7c43a60c55
2026-09-1871pbm_affbdd7c43a60c55
2026-09-1771pbm_affbdd7c43a60c55
2026-09-1672pbm_affbdd7c43a60c55
2026-09-1572pbm_affbdd7c43a60c55
2026-09-1472pbm_affbdd7c43a60c55
2026-09-0972pbm_affbdd7c43a60c55
2026-09-0675pbm_6169a2220134229c
2026-09-0575pbm_6169a2220134229c
2026-09-0376pbm_6169a2220134229c
2026-09-0276pbm_6169a2220134229c
2026-09-0176pbm_6169a2220134229c
2026-08-2876pbm_6169a2220134229c
2026-08-2776pbm_6169a2220134229c
2026-08-2575pbm_145fdb152195dbe4
2026-08-2375pbm_6169a2220134229c
2026-08-2275pbm_6169a2220134229c
2026-08-2075pbm_6169a2220134229c
2026-08-1962pbm_6169a2220134229c
2026-08-1862pbm_6169a2220134229c
2026-08-1762pbm_6169a2220134229c
2026-08-1662pbm_6169a2220134229c
2026-08-1462pbm_6169a2220134229c
2026-08-1362pbm_6169a2220134229c
2026-08-1162pbm_6169a2220134229c
2026-08-1062pbm_6169a2220134229c
2026-08-0962pbm_6169a2220134229c
2026-08-0862pbm_6169a2220134229c
2026-08-0762pbm_6169a2220134229c
2026-08-0562pbm_6169a2220134229c
2026-08-0362pbm_6169a2220134229c
2026-08-0162pbm_6169a2220134229c
2026-07-3162pbm_6169a2220134229c
2026-07-3062pbm_6169a2220134229c
2026-07-2963pbm_6169a2220134229c
2026-07-2863pbm_6169a2220134229c
2026-07-2763pbm_6169a2220134229c
2026-07-2663pbm_6169a2220134229c
2026-07-2563pbm_6169a2220134229c
2026-07-2463pbm_6169a2220134229c
2026-07-2363pbm_6169a2220134229c
2026-07-2262pbm_6169a2220134229c
2026-07-2162pbm_6169a2220134229c
2026-07-1660pbm_6169a2220134229c
2026-07-1461pbm_6169a2220134229c
2026-07-1261pbm_6169a2220134229c
2026-07-1160pbm_6169a2220134229c
2026-07-0957pbm_6169a2220134229c
2026-07-0756pbm_6169a2220134229c
2026-07-0556pbm_6169a2220134229c
2026-07-0357pbm_6169a2220134229c
2026-07-0153pbm_6169a2220134229c
2026-06-3054pbm_6169a2220134229c
2026-06-2955pbm_6169a2220134229c
2026-06-2855pbm_6169a2220134229c
2026-06-2651pbm_6169a2220134229c
2026-06-2551pbm_6169a2220134229c
2026-06-2451pbm_6169a2220134229c
2026-06-2349pbm_6169a2220134229c
2026-06-2249pbm_6169a2220134229c
2026-06-2149pbm_6169a2220134229c
2026-06-2048pbm_6169a2220134229c
2026-06-1951pbm_6169a2220134229c
2026-06-1850pbm_6169a2220134229c
2026-06-1752pbm_6169a2220134229c
2026-06-1651pbm_145fdb152195dbe4
2026-06-1550pbm_145fdb152195dbe4
2026-06-1450pbm_145fdb152195dbe4
2026-06-1350pbm_145fdb152195dbe4
2026-06-1251pbm_145fdb152195dbe4
2026-06-1151pbm_145fdb152195dbe4
2026-06-1050pbm_145fdb152195dbe4
2026-06-0950pbm_145fdb152195dbe4
2026-06-0850pbm_145fdb152195dbe4
2026-06-0750pbm_145fdb152195dbe4
2026-06-0647pbm_145fdb152195dbe4
2026-06-0547pbm_145fdb152195dbe4
2026-06-0447pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 74 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 3/100. This is a model measure, not a statement of real-world risk. Model confidence is 88/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.