Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Iker Redona

CIN · Single-A · P

Prospect Baseline Rank #81

Player Assessment

Current model read

Performance Grade of 70 supports the current evaluation; Age / Level score of 67 indicates favorable developmental context.

Prospect Score & Development

62/100

Solid composite evaluation

Baseline

77/100

Central modeled outcome; separate from Prospect Score.

Confidence

78/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
70/100

Solid current production

K/9
Miss ability12.3 K/9Strong strikeout signal
K-BB%
Dominance24.3% K-BBStrong strikeout-to-walk foundation
HR/9
Contact management0.5 HR/9Limits damaging contact

Scouting Profile

20–80 scouting scale

Individual scouting grades are not currently available for this player.

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

Baseline is 77, between a 70 Floor and 80 Ceiling on Prospect Baseline’s outcome scale. The range leaves room for development while keeping the central outcome in focus.

What to Watch

Track the next performance update and level assignment.

Model factors and risk context
Model Risk Index3
Age to level67
Track record71
Data quality90

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 70Baseline 77Ceiling 80

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 77 on · Current Floor 70, Baseline 77, Ceiling 80

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1277pbm_affbdd7c43a60c55
2026-10-0977pbm_affbdd7c43a60c55
2026-10-0877pbm_affbdd7c43a60c55
2026-10-0777pbm_affbdd7c43a60c55
2026-10-0577pbm_affbdd7c43a60c55
2026-10-0477pbm_affbdd7c43a60c55
2026-10-0376pbm_affbdd7c43a60c55
2026-09-3076pbm_affbdd7c43a60c55
2026-09-2976pbm_affbdd7c43a60c55
2026-09-2576pbm_affbdd7c43a60c55
2026-09-2476pbm_affbdd7c43a60c55
2026-09-2276pbm_affbdd7c43a60c55
2026-09-2176pbm_affbdd7c43a60c55
2026-09-1976pbm_affbdd7c43a60c55
2026-09-1876pbm_affbdd7c43a60c55
2026-09-1776pbm_affbdd7c43a60c55
2026-09-1676pbm_affbdd7c43a60c55
2026-09-1576pbm_affbdd7c43a60c55
2026-09-1476pbm_affbdd7c43a60c55
2026-09-0976pbm_affbdd7c43a60c55
2026-09-0681pbm_6169a2220134229c
2026-09-0581pbm_6169a2220134229c
2026-09-0381pbm_6169a2220134229c
2026-09-0281pbm_6169a2220134229c
2026-09-0181pbm_6169a2220134229c
2026-08-2881pbm_6169a2220134229c
2026-08-2781pbm_6169a2220134229c
2026-08-2582pbm_145fdb152195dbe4
2026-08-2382pbm_6169a2220134229c
2026-08-2281pbm_6169a2220134229c
2026-08-2081pbm_6169a2220134229c
2026-08-1970pbm_6169a2220134229c
2026-08-1870pbm_6169a2220134229c
2026-08-1770pbm_6169a2220134229c
2026-08-1670pbm_6169a2220134229c
2026-08-1470pbm_6169a2220134229c
2026-08-1370pbm_6169a2220134229c
2026-08-1170pbm_6169a2220134229c
2026-08-1070pbm_6169a2220134229c
2026-08-0970pbm_6169a2220134229c
2026-08-0870pbm_6169a2220134229c
2026-08-0770pbm_6169a2220134229c
2026-08-0570pbm_6169a2220134229c
2026-08-0370pbm_6169a2220134229c
2026-08-0170pbm_6169a2220134229c
2026-07-3170pbm_6169a2220134229c
2026-07-3070pbm_6169a2220134229c
2026-07-2970pbm_6169a2220134229c
2026-07-2870pbm_6169a2220134229c
2026-07-2770pbm_6169a2220134229c
2026-07-2670pbm_6169a2220134229c
2026-07-2570pbm_6169a2220134229c
2026-07-2470pbm_6169a2220134229c
2026-07-2371pbm_6169a2220134229c
2026-07-2270pbm_6169a2220134229c
2026-07-2170pbm_6169a2220134229c
2026-07-1670pbm_6169a2220134229c
2026-07-1467pbm_6169a2220134229c
2026-07-1267pbm_6169a2220134229c
2026-07-1167pbm_6169a2220134229c
2026-07-0967pbm_6169a2220134229c
2026-07-0766pbm_6169a2220134229c
2026-07-0566pbm_6169a2220134229c
2026-07-0366pbm_6169a2220134229c
2026-07-0166pbm_6169a2220134229c
2026-06-3066pbm_6169a2220134229c
2026-06-2962pbm_6169a2220134229c
2026-06-2862pbm_6169a2220134229c
2026-06-2662pbm_6169a2220134229c
2026-06-2562pbm_6169a2220134229c
2026-06-2462pbm_6169a2220134229c
2026-06-2363pbm_6169a2220134229c
2026-06-2259pbm_6169a2220134229c
2026-06-2159pbm_6169a2220134229c
2026-06-2059pbm_6169a2220134229c
2026-06-1959pbm_6169a2220134229c
2026-06-1859pbm_6169a2220134229c
2026-06-1759pbm_6169a2220134229c
2026-06-1659pbm_145fdb152195dbe4
2026-06-1559pbm_145fdb152195dbe4
2026-06-1459pbm_145fdb152195dbe4
2026-06-1359pbm_145fdb152195dbe4
2026-06-1259pbm_145fdb152195dbe4
2026-06-1159pbm_145fdb152195dbe4
2026-06-1059pbm_145fdb152195dbe4
2026-06-0959pbm_145fdb152195dbe4
2026-06-0859pbm_145fdb152195dbe4
2026-06-0759pbm_145fdb152195dbe4
2026-06-0655pbm_145fdb152195dbe4
2026-06-0555pbm_145fdb152195dbe4
2026-06-0455pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 80 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 3/100. This is a model measure, not a statement of real-world risk. Model confidence is 78/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.