Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

David Shields

KC · High-A · P

Prospect Baseline Rank #59

Player Assessment

Current model read

David Shields's current production is forcing the profile above its original scouting foundation. The 70 Performance Grade sits 15 points above the 55 scouting foundation, a large enough gap to change the shape of the evaluation.

Prospect Score & Development

63/100

Solid composite evaluation

Baseline

76/100

Central modeled outcome; separate from Prospect Score.

Confidence

91/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
70/100

Solid current production

K/9
Miss ability10.7 K/9Strong strikeout signal
K-BB%
Dominance23.7% K-BBStrong strikeout-to-walk foundation
WHIP
Traffic prevention1.08 WHIPStrong traffic prevention

Scouting Profile

20–80 scouting scale
Overall
55
Fastball
45
Slider
55
Curveball
50
Changeup
55
Control
55

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The current Baseline is 76; the model's plausible outcome window runs from 64 on the low end to 79 on the high end. The spread leaves room for development without making uncertainty the defining feature of the profile. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The key question is whether the production forces the scouting view upward rather than drifting back toward it. Repeating the same performance against stronger competition or over a larger sample would strengthen the Floor and make the breakout harder to dismiss. That confirmation matters more now than simply adding another short stretch of strong surface numbers.

Model factors and risk context
Model Risk Index0
Age to level61
Track record74
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 64Baseline 76Ceiling 79

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 76 on · Current Floor 64, Baseline 76, Ceiling 79

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1276pbm_affbdd7c43a60c55
2026-10-0976pbm_affbdd7c43a60c55
2026-10-0876pbm_affbdd7c43a60c55
2026-10-0777pbm_affbdd7c43a60c55
2026-10-0577pbm_affbdd7c43a60c55
2026-10-0477pbm_affbdd7c43a60c55
2026-10-0377pbm_affbdd7c43a60c55
2026-09-3077pbm_affbdd7c43a60c55
2026-09-2977pbm_affbdd7c43a60c55
2026-09-2579pbm_affbdd7c43a60c55
2026-09-2479pbm_affbdd7c43a60c55
2026-09-2279pbm_affbdd7c43a60c55
2026-09-2179pbm_affbdd7c43a60c55
2026-09-1979pbm_affbdd7c43a60c55
2026-09-1879pbm_affbdd7c43a60c55
2026-09-1779pbm_affbdd7c43a60c55
2026-09-1679pbm_affbdd7c43a60c55
2026-09-1579pbm_affbdd7c43a60c55
2026-09-1479pbm_affbdd7c43a60c55
2026-09-0979pbm_affbdd7c43a60c55
2026-09-0678pbm_6169a2220134229c
2026-09-0578pbm_6169a2220134229c
2026-09-0378pbm_6169a2220134229c
2026-09-0278pbm_6169a2220134229c
2026-09-0178pbm_6169a2220134229c
2026-08-2877pbm_6169a2220134229c
2026-08-2777pbm_6169a2220134229c
2026-08-2577pbm_145fdb152195dbe4
2026-08-2377pbm_6169a2220134229c
2026-08-2277pbm_6169a2220134229c
2026-08-2077pbm_6169a2220134229c
2026-08-1977pbm_6169a2220134229c
2026-08-1877pbm_6169a2220134229c
2026-08-1777pbm_6169a2220134229c
2026-08-1677pbm_6169a2220134229c
2026-08-1476pbm_6169a2220134229c
2026-08-1376pbm_6169a2220134229c
2026-08-1176pbm_6169a2220134229c
2026-08-1076pbm_6169a2220134229c
2026-08-0976pbm_6169a2220134229c
2026-08-0876pbm_6169a2220134229c
2026-08-0775pbm_6169a2220134229c
2026-08-0575pbm_6169a2220134229c
2026-08-0375pbm_6169a2220134229c
2026-08-0175pbm_6169a2220134229c
2026-07-3175pbm_6169a2220134229c
2026-07-3075pbm_6169a2220134229c
2026-07-2975pbm_6169a2220134229c
2026-07-2875pbm_6169a2220134229c
2026-07-2775pbm_6169a2220134229c
2026-07-2675pbm_6169a2220134229c
2026-07-2575pbm_6169a2220134229c
2026-07-2476pbm_6169a2220134229c
2026-07-2376pbm_6169a2220134229c
2026-07-2276pbm_6169a2220134229c
2026-07-2176pbm_6169a2220134229c
2026-07-1676pbm_6169a2220134229c
2026-07-1476pbm_6169a2220134229c
2026-07-1277pbm_6169a2220134229c
2026-07-1177pbm_6169a2220134229c
2026-07-0977pbm_6169a2220134229c
2026-07-0775pbm_6169a2220134229c
2026-07-0575pbm_6169a2220134229c
2026-07-0375pbm_6169a2220134229c
2026-07-0177pbm_6169a2220134229c
2026-06-3077pbm_6169a2220134229c
2026-06-2977pbm_6169a2220134229c
2026-06-2877pbm_6169a2220134229c
2026-06-2677pbm_6169a2220134229c
2026-06-2575pbm_6169a2220134229c
2026-06-2475pbm_6169a2220134229c
2026-06-2375pbm_6169a2220134229c
2026-06-2275pbm_6169a2220134229c
2026-06-2175pbm_6169a2220134229c
2026-06-2075pbm_6169a2220134229c
2026-06-1975pbm_6169a2220134229c
2026-06-1873pbm_6169a2220134229c
2026-06-1773pbm_6169a2220134229c
2026-06-1672pbm_145fdb152195dbe4
2026-06-1572pbm_145fdb152195dbe4
2026-06-1472pbm_145fdb152195dbe4
2026-06-1372pbm_145fdb152195dbe4
2026-06-1267pbm_145fdb152195dbe4
2026-06-1168pbm_145fdb152195dbe4
2026-06-1068pbm_145fdb152195dbe4
2026-06-0968pbm_145fdb152195dbe4
2026-06-0868pbm_145fdb152195dbe4
2026-06-0768pbm_145fdb152195dbe4
2026-06-0668pbm_145fdb152195dbe4
2026-06-0572pbm_145fdb152195dbe4
2026-06-0472pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 79 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 91/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.