Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Eric Hartman

ATL · AA · OF

Prospect Baseline Rank #30

Player Assessment

Current model read

Eric Hartman's profile is not evenly distributed; one tool is doing most of the separating. Run (70) is the clearest carrying tool in the current scouting mix. The age-to-level relationship adds development value to the current performance.

Prospect Score & Development

67/100

Solid composite evaluation

Baseline

75/100

Central modeled outcome; separate from Prospect Score.

Confidence

94/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
59/100

Solid current production

ISO
Power.207 ISOAbove-average game power
K%
Contact25.0% KNear expected range
BB%
Approach11.8% BBStrong on-base approach

Scouting Profile

20–80 scouting scale
Overall
55
Hit
55
Power
50
Run
70
Field
50
Arm
45

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

The current Baseline is 75; the model's plausible outcome window runs from 53 on the low end to 78 on the high end. The very wide spread keeps both the upside and downside cases relevant to the current evaluation. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The next level of competition is the most informative test. At AA, age-to-level context is already helping the projection. Maintaining the same indicators against stronger competition would strengthen the Baseline more than simply repeating the current line in place.

Model factors and risk context
Model Risk Index0
Age to level72
Track record64
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 53Baseline 75Ceiling 78

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 75 on · Current Floor 53, Baseline 75, Ceiling 78

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1275pbm_affbdd7c43a60c55
2026-10-0975pbm_affbdd7c43a60c55
2026-10-0875pbm_affbdd7c43a60c55
2026-10-0774pbm_affbdd7c43a60c55
2026-10-0574pbm_affbdd7c43a60c55
2026-10-0474pbm_affbdd7c43a60c55
2026-10-0374pbm_affbdd7c43a60c55
2026-09-3074pbm_affbdd7c43a60c55
2026-09-2974pbm_affbdd7c43a60c55
2026-09-2574pbm_affbdd7c43a60c55
2026-09-2474pbm_affbdd7c43a60c55
2026-09-2274pbm_affbdd7c43a60c55
2026-09-2174pbm_affbdd7c43a60c55
2026-09-1974pbm_affbdd7c43a60c55
2026-09-1874pbm_affbdd7c43a60c55
2026-09-1774pbm_affbdd7c43a60c55
2026-09-1674pbm_affbdd7c43a60c55
2026-09-1574pbm_affbdd7c43a60c55
2026-09-1474pbm_affbdd7c43a60c55
2026-09-0974pbm_affbdd7c43a60c55
2026-09-0672pbm_6169a2220134229c
2026-09-0572pbm_6169a2220134229c
2026-09-0372pbm_6169a2220134229c
2026-09-0272pbm_6169a2220134229c
2026-09-0172pbm_6169a2220134229c
2026-08-2873pbm_6169a2220134229c
2026-08-2773pbm_6169a2220134229c
2026-08-2572pbm_145fdb152195dbe4
2026-08-2372pbm_6169a2220134229c
2026-08-2272pbm_6169a2220134229c
2026-08-2072pbm_6169a2220134229c
2026-08-1969pbm_6169a2220134229c
2026-08-1870pbm_6169a2220134229c
2026-08-1770pbm_6169a2220134229c
2026-08-1670pbm_6169a2220134229c
2026-08-1465pbm_6169a2220134229c
2026-08-1365pbm_6169a2220134229c
2026-08-1165pbm_6169a2220134229c
2026-08-1065pbm_6169a2220134229c
2026-08-0967pbm_6169a2220134229c
2026-08-0867pbm_6169a2220134229c
2026-08-0767pbm_6169a2220134229c
2026-08-0567pbm_6169a2220134229c
2026-08-0370pbm_6169a2220134229c
2026-08-0170pbm_6169a2220134229c
2026-07-3170pbm_6169a2220134229c
2026-07-3070pbm_6169a2220134229c
2026-07-2970pbm_6169a2220134229c
2026-07-2870pbm_6169a2220134229c
2026-07-2770pbm_6169a2220134229c
2026-07-2670pbm_6169a2220134229c
2026-07-2570pbm_6169a2220134229c
2026-07-2470pbm_6169a2220134229c
2026-07-2370pbm_6169a2220134229c
2026-07-2270pbm_6169a2220134229c
2026-07-2170pbm_6169a2220134229c
2026-07-1670pbm_6169a2220134229c
2026-07-1470pbm_6169a2220134229c
2026-07-1270pbm_6169a2220134229c
2026-07-1170pbm_6169a2220134229c
2026-07-0970pbm_6169a2220134229c
2026-07-0770pbm_6169a2220134229c
2026-07-0570pbm_6169a2220134229c
2026-07-0371pbm_6169a2220134229c
2026-07-0171pbm_6169a2220134229c
2026-06-3071pbm_6169a2220134229c
2026-06-2971pbm_6169a2220134229c
2026-06-2870pbm_6169a2220134229c
2026-06-2670pbm_6169a2220134229c
2026-06-2571pbm_6169a2220134229c
2026-06-2472pbm_6169a2220134229c
2026-06-2372pbm_6169a2220134229c
2026-06-2272pbm_6169a2220134229c
2026-06-2172pbm_6169a2220134229c
2026-06-2071pbm_6169a2220134229c
2026-06-1972pbm_6169a2220134229c
2026-06-1872pbm_6169a2220134229c
2026-06-1773pbm_6169a2220134229c
2026-06-1675pbm_145fdb152195dbe4
2026-06-1576pbm_145fdb152195dbe4
2026-06-1476pbm_145fdb152195dbe4
2026-06-1375pbm_145fdb152195dbe4
2026-06-1276pbm_145fdb152195dbe4
2026-06-1176pbm_145fdb152195dbe4
2026-06-1075pbm_145fdb152195dbe4
2026-06-0977pbm_145fdb152195dbe4
2026-06-0877pbm_145fdb152195dbe4
2026-06-0777pbm_145fdb152195dbe4
2026-06-0673pbm_145fdb152195dbe4
2026-06-0572pbm_145fdb152195dbe4
2026-06-0473pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 78 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 94/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.