Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Jesús Báez

STL · AA · SS

Prospect Baseline Rank #162

Player Assessment

Current model read

Jesús Báez's current production is forcing the profile above its original scouting foundation. The 64 Performance Grade sits 19 points above the 45 scouting foundation, a large enough gap to change the shape of the evaluation.

Prospect Score & Development

59/100

Developing composite evaluation

Baseline

73/100

Central modeled outcome; separate from Prospect Score.

Confidence

93/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
64/100

Solid current production

ISO
Power.304 ISOAbove-average game power
K%
Contact16.0% KStrong contact signal
BB%
Approach5.6% BBNear expected range

Scouting Profile

20–80 scouting scale
Overall
45
Hit
45
Power
50
Run
40
Field
45
Arm
60

Grades updated 2026-09-29

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

Prospect Baseline places the central outcome at 73, with a modeled range from 58 to 76. The width matters: the upside is real, but the profile still has enough unresolved information to produce materially different outcomes. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The key question is whether the production forces the scouting view upward rather than drifting back toward it. Repeating the same performance against stronger competition or over a larger sample would strengthen the Floor and make the breakout harder to dismiss. That confirmation matters more now than simply adding another short stretch of strong surface numbers.

Model factors and risk context
Model Risk Index0
Age to level65
Track record69
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 58Baseline 73Ceiling 76

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 73 on · Current Floor 58, Baseline 73, Ceiling 76

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1273pbm_affbdd7c43a60c55
2026-10-0973pbm_affbdd7c43a60c55
2026-10-0873pbm_affbdd7c43a60c55
2026-10-0772pbm_affbdd7c43a60c55
2026-10-0572pbm_affbdd7c43a60c55
2026-10-0472pbm_affbdd7c43a60c55
2026-10-0372pbm_affbdd7c43a60c55
2026-09-3072pbm_affbdd7c43a60c55
2026-09-2972pbm_affbdd7c43a60c55
2026-09-2572pbm_affbdd7c43a60c55
2026-09-2472pbm_affbdd7c43a60c55
2026-09-2272pbm_affbdd7c43a60c55
2026-09-2172pbm_affbdd7c43a60c55
2026-09-1972pbm_affbdd7c43a60c55
2026-09-1872pbm_affbdd7c43a60c55
2026-09-1772pbm_affbdd7c43a60c55
2026-09-1673pbm_affbdd7c43a60c55
2026-09-1573pbm_affbdd7c43a60c55
2026-09-1473pbm_affbdd7c43a60c55
2026-09-0973pbm_affbdd7c43a60c55
2026-09-0678pbm_6169a2220134229c
2026-09-0578pbm_6169a2220134229c
2026-09-0377pbm_6169a2220134229c
2026-09-0277pbm_6169a2220134229c
2026-09-0178pbm_6169a2220134229c
2026-08-2876pbm_6169a2220134229c
2026-08-2776pbm_6169a2220134229c
2026-08-2573pbm_145fdb152195dbe4
2026-08-2373pbm_6169a2220134229c
2026-08-2273pbm_6169a2220134229c
2026-08-2074pbm_6169a2220134229c
2026-08-1974pbm_6169a2220134229c
2026-08-1874pbm_6169a2220134229c
2026-08-1775pbm_6169a2220134229c
2026-08-1675pbm_6169a2220134229c
2026-08-1476pbm_6169a2220134229c
2026-08-1375pbm_6169a2220134229c
2026-08-1175pbm_6169a2220134229c
2026-08-1075pbm_6169a2220134229c
2026-08-0972pbm_6169a2220134229c
2026-08-0872pbm_6169a2220134229c
2026-08-0773pbm_6169a2220134229c
2026-08-0572pbm_6169a2220134229c
2026-08-0372pbm_6169a2220134229c
2026-08-0169pbm_6169a2220134229c
2026-07-3170pbm_6169a2220134229c
2026-07-3070pbm_6169a2220134229c
2026-07-2970pbm_6169a2220134229c
2026-07-2870pbm_6169a2220134229c
2026-07-2770pbm_6169a2220134229c
2026-07-2670pbm_6169a2220134229c
2026-07-2569pbm_6169a2220134229c
2026-07-2468pbm_6169a2220134229c
2026-07-2368pbm_6169a2220134229c
2026-07-2268pbm_6169a2220134229c
2026-07-2169pbm_6169a2220134229c
2026-07-1670pbm_6169a2220134229c
2026-07-1470pbm_6169a2220134229c
2026-07-1270pbm_6169a2220134229c
2026-07-1169pbm_6169a2220134229c
2026-07-0968pbm_6169a2220134229c
2026-07-0768pbm_6169a2220134229c
2026-07-0568pbm_6169a2220134229c
2026-07-0369pbm_6169a2220134229c
2026-07-0170pbm_6169a2220134229c
2026-06-3070pbm_6169a2220134229c
2026-06-2970pbm_6169a2220134229c
2026-06-2868pbm_6169a2220134229c
2026-06-2670pbm_6169a2220134229c
2026-06-2570pbm_6169a2220134229c
2026-06-2450pbm_6169a2220134229c
2026-06-2356pbm_6169a2220134229c
2026-06-2256pbm_6169a2220134229c
2026-06-2156pbm_6169a2220134229c
2026-06-2057pbm_6169a2220134229c
2026-06-1957pbm_6169a2220134229c
2026-06-1857pbm_6169a2220134229c
2026-06-1757pbm_6169a2220134229c
2026-06-1657pbm_145fdb152195dbe4
2026-06-1557pbm_145fdb152195dbe4
2026-06-1457pbm_145fdb152195dbe4
2026-06-1357pbm_145fdb152195dbe4
2026-06-1257pbm_145fdb152195dbe4
2026-06-1156pbm_145fdb152195dbe4
2026-06-1055pbm_145fdb152195dbe4
2026-06-0956pbm_145fdb152195dbe4
2026-06-0856pbm_145fdb152195dbe4
2026-06-0756pbm_145fdb152195dbe4
2026-06-0654pbm_145fdb152195dbe4
2026-06-0554pbm_145fdb152195dbe4
2026-06-0454pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 76 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 93/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.