Prospect Baseline Prospect Baseline
Model Last Run Oct 12, 2026
Prospect Baseline Profile

Ben Grable

WSH · AAA · P

Prospect Baseline Rank #89

Player Assessment

Current model read

Performance is doing more work than the scouting grade in Ben Grable's current evaluation. The 73 Performance Grade sits 28 points above the 45 scouting foundation, a large enough gap to change the shape of the evaluation. Fastball (70) is the clearest carrying tool in the current scouting mix.

Prospect Score & Development

62/100

Solid composite evaluation

Baseline

76/100

Central modeled outcome; separate from Prospect Score.

Confidence

93/100

High confidence

Evidence strength, separate from model risk.

Performance context

Model-derived assessment
73/100

Solid current production

K/9
Miss ability13.6 K/9Strong strikeout signal
K-BB%
Dominance26.2% K-BBStrong strikeout-to-walk foundation
HR/9
Contact management0.2 HR/9Limits damaging contact

Scouting Profile

20–80 scouting scale
Overall
45
Fastball
70
Slider
55
Control
55

Grades updated 2026-10-05

Supporting Evidence and What to Watch

Current model assessment

Supporting Evidence

Prospect Baseline places the central outcome at 76, with a modeled range from 67 to 79. The spread leaves room for development without making uncertainty the defining feature of the profile. The supporting evidence is comparatively mature, so future movement should require a more meaningful change in performance or scouting information.

What to Watch

The key question is whether the production forces the scouting view upward rather than drifting back toward it. Repeating the same performance against stronger competition or over a larger sample would strengthen the Floor and make the breakout harder to dismiss. That confirmation matters more now than simply adding another short stretch of strong surface numbers.

Model factors and risk context
Model Risk Index0
Age to level55
Track record78
Data quality100

Risk, age-to-level, track record and data quality are separate model fields. A missing value is not zero.

Projected Outcome Range

Floor 67Baseline 76Ceiling 79

These are modeled outcome bands on the Prospect Baseline 0–100 scale, not guaranteed MLB outcomes.

Forecast

Statistical projections

No statistical forecast is published for this player. The current profile data does not include a documented rate forecast method, target population, or validation results.

Development Trajectory

Recorded Baseline assessments

Latest recorded Baseline: 76 on · Current Floor 67, Baseline 76, Ceiling 79

Recorded history Current Floor–Ceiling range

The chart connects recorded points only within the same model version and starts a new segment across gaps longer than 120 days. Routine point markers are suppressed; changes of 8 or more Baseline points are marked. The vertical whisker shows the current range and Baseline.

View recorded values
DateBaselineModel version
2026-10-1276pbm_affbdd7c43a60c55
2026-10-0976pbm_affbdd7c43a60c55
2026-10-0876pbm_affbdd7c43a60c55
2026-10-0776pbm_affbdd7c43a60c55
2026-10-0576pbm_affbdd7c43a60c55
2026-10-0476pbm_affbdd7c43a60c55
2026-10-0376pbm_affbdd7c43a60c55
2026-09-3076pbm_affbdd7c43a60c55
2026-09-2976pbm_affbdd7c43a60c55
2026-09-2576pbm_affbdd7c43a60c55
2026-09-2476pbm_affbdd7c43a60c55
2026-09-2276pbm_affbdd7c43a60c55
2026-09-2176pbm_affbdd7c43a60c55
2026-09-1976pbm_affbdd7c43a60c55
2026-09-1875pbm_affbdd7c43a60c55
2026-09-1775pbm_affbdd7c43a60c55
2026-09-1676pbm_affbdd7c43a60c55
2026-09-1576pbm_affbdd7c43a60c55
2026-09-1476pbm_affbdd7c43a60c55
2026-09-0978pbm_affbdd7c43a60c55
2026-09-0655pbm_6169a2220134229c
2026-09-0555pbm_6169a2220134229c
2026-09-0353pbm_6169a2220134229c
2026-09-0252pbm_6169a2220134229c
2026-09-0152pbm_6169a2220134229c
2026-08-2850pbm_6169a2220134229c
2026-08-2750pbm_6169a2220134229c
2026-08-2571pbm_145fdb152195dbe4
2026-08-2371pbm_6169a2220134229c
2026-08-2271pbm_6169a2220134229c
2026-08-2071pbm_6169a2220134229c
2026-08-1971pbm_6169a2220134229c
2026-08-1871pbm_6169a2220134229c
2026-08-1770pbm_6169a2220134229c
2026-08-1670pbm_6169a2220134229c
2026-08-1470pbm_6169a2220134229c
2026-08-1369pbm_6169a2220134229c
2026-08-1169pbm_6169a2220134229c
2026-08-1068pbm_6169a2220134229c
2026-08-0968pbm_6169a2220134229c
2026-08-0868pbm_6169a2220134229c
2026-08-0766pbm_6169a2220134229c
2026-08-0566pbm_6169a2220134229c
2026-08-0366pbm_6169a2220134229c
2026-08-0166pbm_6169a2220134229c
2026-07-3166pbm_6169a2220134229c
2026-07-3065pbm_6169a2220134229c
2026-07-2965pbm_6169a2220134229c
2026-07-2865pbm_6169a2220134229c
2026-07-2765pbm_6169a2220134229c
2026-07-2665pbm_6169a2220134229c
2026-07-2565pbm_6169a2220134229c
2026-07-2465pbm_6169a2220134229c
2026-07-2365pbm_6169a2220134229c
2026-07-2265pbm_6169a2220134229c
2026-07-2165pbm_6169a2220134229c
2026-07-1663pbm_6169a2220134229c
2026-07-1463pbm_6169a2220134229c
2026-07-1263pbm_6169a2220134229c
2026-07-1163pbm_6169a2220134229c
2026-07-0963pbm_6169a2220134229c
2026-07-0761pbm_6169a2220134229c
2026-07-0559pbm_6169a2220134229c
2026-07-0359pbm_6169a2220134229c
2026-07-0160pbm_6169a2220134229c
2026-06-3060pbm_6169a2220134229c
2026-06-2960pbm_6169a2220134229c
2026-06-2859pbm_6169a2220134229c
2026-06-2661pbm_6169a2220134229c
2026-06-2562pbm_6169a2220134229c
2026-06-2462pbm_6169a2220134229c
2026-06-2362pbm_6169a2220134229c
2026-06-2262pbm_6169a2220134229c
2026-06-2162pbm_6169a2220134229c
2026-06-2061pbm_6169a2220134229c
2026-06-1961pbm_6169a2220134229c
2026-06-1861pbm_6169a2220134229c
2026-06-1759pbm_6169a2220134229c
2026-06-1659pbm_145fdb152195dbe4
2026-06-1559pbm_145fdb152195dbe4
2026-06-1459pbm_145fdb152195dbe4
2026-06-1360pbm_145fdb152195dbe4
2026-06-1260pbm_145fdb152195dbe4
2026-06-1160pbm_145fdb152195dbe4
2026-06-1061pbm_145fdb152195dbe4
2026-06-0961pbm_145fdb152195dbe4
2026-06-0861pbm_145fdb152195dbe4
2026-06-0761pbm_145fdb152195dbe4
2026-06-0661pbm_145fdb152195dbe4
2026-06-0561pbm_145fdb152195dbe4
2026-06-0461pbm_145fdb152195dbe4

Development Outlook

Upside and risk

↑ Upside

The current Ceiling of 79 is 3 points above the Baseline. This is an outcome range, not a timed forecast.

⚑ Risk Factors

Model Risk Index: 0/100. This is a model measure, not a statement of real-world risk. Model confidence is 93/100 and is measured separately. Data quality and developmental uncertainty are also distinct.

Projection updated October 12, 2026 · Methodology

Projected Outcome Range Guide

How the Prospect Baseline outcome scale maps to player outcome tiers. The separate scouting bars use the traditional 20–80 scale.

Fringe<40
Developing40–59
Solid60–69
Above average70–79
Impact80–89
Generational90–100

Floor, Baseline, and Ceiling describe the current range of modeled outcomes. They are not guaranteed results or dates.